This building took about 40 pallets to complete. Refer to plans or the drawing below for block placements, and refer to roof plan to show position of each ladder-type unit over front and rear walls. If you choose to use burlap to support roof you might want to provide garrets 3 inches apart. We went crazy at this point and purchased a load of 2x3's and a few 2x4's to frame out walls. Make sure corners are square and leave no gaps between the ( https://sheddrafts.com/10x12-gambrel-garden-shed-plans-blueprints ) components. Reposition catwalk, as necessary, and mark side of a rafter at 64 inches above joist that's below that rafter. Mark locations for equally spaced rafters on front of ledger. Without expensive fancy tools process is very labor intensive. Auger style anchors are a rod with a wide helix or screw disc at the base. Cut the existing nails at all joist-to-girder connections with reciprocating saw. Draw a horizontal line from the desired fascia thickness toward t